نتایج جستجو برای: Flexible Flow Lines

تعداد نتایج: 795444  

Journal: :journal of optimization in industrial engineering 2015
bahman naderi mehdi yazdani

although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. this paper deals with scheduling jobs in lot streaming flexible flow line problems. the paper mathematically formulates the problem by a mixed integer linear programming model. this model solves small instances to optimality. moreo...

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

Journal: :European Journal of Operational Research 2004

Journal: :European Journal of Operational Research 1997

Journal: :نشریه دانشکده فنی 0
رضا برادران کاظم زاده سیدحسام الدین ذگردی محمدعلی بهشتی نیا

this study considers scheduling in hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. this problem does not study in the literature, so far. flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. after mode...

Journal: :مهندسی صنایع 0
سیدعلی ترابی دانشگاه تهران مسعود جنابی دانشگاه صنعتی امیرکبیر

in this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. single supplier via a flexible flow line production system (ffl) produces several items and delivers them directly to an assembly facility. based on basic period (bp) strategy, a new mixed zero-one nonlinear programming model has been develope...

In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...

Mohammad Ali Beheshti Nia Reza Baradaran Kazemzadeh Seyyed Hesamoddin Zegardi

This study considers scheduling in Hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. This problem does not study in the literature, so far. Flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. After modeling the p...

Journal: :مدیریت صنعتی 0
بابک اسلانی کارشناس ارشد مدیریت صنعتی، دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران مصطفی زندیه دانشیار گروه مدیریت دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران مجید عادلی دانشجوی دکتری مدیریت تولید و عملیات، دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران

one of the main challenges for manufacturers in production systems on order is balancing between orders, inputs and limited resources. hence, they have to choose some orders and reject the others. in addition, work schedule must be considered in order acceptance. in this research the integrated problem of scheduling and order acceptance in a no wait flexible flow line production system is discu...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید